Title :
Discussion on issues of engineering alteration and construction claim
Author :
Gang, Chen ; Wang Culling
Author_Institution :
Coll. of Hydraulic & Environ. Eng., Three Gorges Univ., Yichang, China
fYear :
2011
fDate :
22-24 April 2011
Firstpage :
1171
Lastpage :
1174
Abstract :
In the civil and hydroelectric engineering management, engineering variations are always solved by the way of construction claim compensation, which no doubt increases the difficulty of the claim. In this paper, through definition of engineering changes and construction claims, and discriminating analysis of their processing program and mode of payment, it is presented that contractor should use the clause of engineering alteration rationally. Defects of drawing and technical specification, changes of owner´s require and strict inspection and inappropriate refuse of engineers should be listed in engineering alteration, try to make it legalization. In the end, an example is taken to illustrate the effect, which makes the contractor gain more benefit and decrease less loss.
Keywords :
civil engineering; contracts; management science; civil engineering management; construction claim compensation; contractor; engineering alteration; hydroelectric engineering management; Compaction; Contracts; Force; Inspection; Soil; Waste materials; construction claim; engineering alteration; engineering management;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
Conference_Location :
Lushan
Print_ISBN :
978-1-4577-0289-1
Type :
conf
DOI :
10.1109/ICETCE.2011.5774582
Filename :
5774582
Link To Document :
بازگشت