    A new method to recently-filled hydraulic fill treatment

  • Author

    Cheng, Yuxiang ; Du, Dongju

  • Author_Institution
    Chang´´an Univ., Xi´´an, China
  • fYear
    2011
  • fDate
    27-29 May 2011
  • Firstpage
    383
  • Lastpage
    386
  • Abstract
    The problems of the vacuum preloading method in treating recently-filled hydraulic fill are analyzed. The improved vacuum preloading method is put forward for the treatment of recently-fill hydraulic fills; the model tests of the key technology of the improved vacuum preloading method have been performed. The superiority of the method is studied. The study result shows that: the improved vacuum preloading method can overcome the disadvantages of the vacuum preloading method in dealing with recently-fill hydraulic fill, can be constructed on the surface of the mud fill directly, and can save processing time more than 6 months and about 40% of the pre-processing costs.
  • Keywords
    geotechnical engineering; hydraulic systems; sediments; soil; structural engineering; hydraulic fill treatment; mud fill; soft soil treatment; vacuum preloading method; Surface treatment; Vacuum technology; hydraulic fill; improve; key technology; simulation test; vacuum preloading;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Communication Software and Networks (ICCSN), 2011 IEEE 3rd International Conference on
  • Conference_Location
    Xi´an
  • Print_ISBN
    978-1-61284-485-5
  • Type

    conf

  • DOI
    10.1109/ICCSN.2011.6013854
  • Filename