DocumentCode :
322606
Title :
Dutch distribution cable: improvements in construction, reliability, environment and efficiency
Author :
Grotenhuis, B.J. ; Kerstens, A. ; van Riet, M.J.M.
Author_Institution :
REMU Energy Company, Netherlands
Volume :
3
fYear :
1997
fDate :
1997
Firstpage :
42522
Abstract :
In this paper the existing medium voltage cable grid in the Netherlands is shown. The perfect performance of these cables is responsible for the very short outage times in our country. Typical is the belted paper 12 kV cable with a very good performance since 1905. However, problems with this type of cable have occurred more frequently. With the arrival of the newly developed 12 kV three phase XLPE cable we can solve the paper cable problems. The main solution is using the XLPE cable for high and strongly changing loads. For the normal thin distribution cables the existing paper cable can be used for more than 40 years. The future development of cable systems will be in two ways: firstly by diagnostics like 0.1 Hz partial discharge measurements; and secondly by monitoring and by protection with integrated fibre optics in all types of power cables. With these developments we will come to ´total cable management´
Keywords :
distribution networks; 12 kV; Netherlands; construction improvements; distribution cable; efficiency improvements; environmental improvements; high loads; integrated fibre optics; medium voltage cable grid; monitoring; partial discharge measurement; protection; reliability improvements; short outage times; strongly changing loads; thin distribution cables; three phase XLPE cable; total cable management;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Electricity Distribution. Part 1: Contributions. CIRED. 14th International Conference and Exhibition on (IEE Conf. Publ. No. 438)
Conference_Location :
Birmingham
ISSN :
0537-9989
Print_ISBN :
0-85296-674-1
Type :
conf
DOI :
10.1049/cp:19970514
Filename :
667953
Link To Document :
بازگشت