DocumentCode
3226116
Title
A time window based approach for job shop scheduling
Author
Chen, Haoxun ; Luh, Peter B. ; Fang, Lei
Author_Institution
Dept. of Electr. & Comput. Eng., Connecticut Univ., Storrs, CT, USA
Volume
1
fYear
2001
fDate
2001
Firstpage
842
Abstract
A time window based approach is developed for job shop scheduling problems to minimize the weighted earliness and tardiness cost. With the time windows provided by Lagrangian relaxation within which parts are processed to minimize the cost and an effective algorithm to find a feasible schedule within or approximately within the windows, the approach can generate schedules better than those generated by the Lagrangian relaxation approach for large problems in a similar computation time. This demonstrates that our approach can be used to solve practical scheduling problems with an improved performance.
Keywords
computational complexity; constraint theory; iterative methods; minimisation; production control; Lagrangian relaxation; feasible schedule; job shop scheduling; time window based approach; weighted earliness cost; weighted tardiness cost; Costs; Dynamic programming; Job shop scheduling; Lagrangian functions; Manufacturing; Processor scheduling; Production; Propagation delay; Resource management; Scheduling algorithm;
fLanguage
English
Publisher
ieee
Conference_Titel
Robotics and Automation, 2001. Proceedings 2001 ICRA. IEEE International Conference on
ISSN
1050-4729
Print_ISBN
0-7803-6576-3
Type
conf
DOI
10.1109/ROBOT.2001.932655
Filename
932655
Link To Document