• DocumentCode
    3226116
  • Title

    A time window based approach for job shop scheduling

  • Author

    Chen, Haoxun ; Luh, Peter B. ; Fang, Lei

  • Author_Institution
    Dept. of Electr. & Comput. Eng., Connecticut Univ., Storrs, CT, USA
  • Volume
    1
  • fYear
    2001
  • fDate
    2001
  • Firstpage
    842
  • Abstract
    A time window based approach is developed for job shop scheduling problems to minimize the weighted earliness and tardiness cost. With the time windows provided by Lagrangian relaxation within which parts are processed to minimize the cost and an effective algorithm to find a feasible schedule within or approximately within the windows, the approach can generate schedules better than those generated by the Lagrangian relaxation approach for large problems in a similar computation time. This demonstrates that our approach can be used to solve practical scheduling problems with an improved performance.
  • Keywords
    computational complexity; constraint theory; iterative methods; minimisation; production control; Lagrangian relaxation; feasible schedule; job shop scheduling; time window based approach; weighted earliness cost; weighted tardiness cost; Costs; Dynamic programming; Job shop scheduling; Lagrangian functions; Manufacturing; Processor scheduling; Production; Propagation delay; Resource management; Scheduling algorithm;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Robotics and Automation, 2001. Proceedings 2001 ICRA. IEEE International Conference on
  • ISSN
    1050-4729
  • Print_ISBN
    0-7803-6576-3
  • Type

    conf

  • DOI
    10.1109/ROBOT.2001.932655
  • Filename
    932655