DocumentCode :
322804
Title :
Real experience in the connection of wind power production in distribution network
Author :
Criado, R. ; Soto, J. ; Izcue, C. ; Itoiz, C.
Volume :
5
fYear :
1997
fDate :
2-5 June 1997
Abstract :
For the implantation of the wind farm at the El Perdon site, numerous measurements were made of wind direction and speed. These measurements made it possible to predict a high number of hours of operation annually and an important energy production. Moreover, it was necessary to determine the ideal connection point to the network that would guarantee the removal (evacuation) of the energy produced and to study the impact of the wind farm in order to preserve the supply quality parameters already set by IBERDROLA. Finally, the results of real operation and the measurements carried out are shown, to prove that the voltage and frequency quality are as forecast.
Keywords :
distribution networks; power supply quality; velocity measurement; wind power; El Perdon site; IBERDROLA; Navarra Wind Energy Programme; distribution network; energy production; frequency quality; ideal connection point; supply quality parameters; voltage quality; wind direction measurement; wind power production connection; wind speed measurement;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Electricity Distribution. Part 1: Contributions. CIRED. 14th International Conference and Exhibition on (IEE Conf. Publ. No. 438)
ISSN :
0537-9989
Print_ISBN :
0-85296-674-1
Type :
conf
DOI :
10.1049/cp:19970607
Filename :
670230
Link To Document :
بازگشت