DocumentCode :
3229046
Title :
Problems of planning hybrid wind-diesel power systems
Author :
Rosa, Pedro ; Lemos, Wellington ; Pereira, Alexandre ; Barros, Renato ; Feitosa, Everaldo
Author_Institution :
Electr. Power Eng. Dept., Fed. Univ. of Pernambuco, Brazil
fYear :
2004
fDate :
8-11 Nov. 2004
Firstpage :
617
Lastpage :
622
Abstract :
This paper presents the main limiting operational factors of planning wind-diesel hybrid power systems. The Fernando de Noronha Island, the largest wind-diesel system installed in Brazil, is used as study case. The main operational factors analysed in this paper are the voltage level, the diesel operational limits and electrical losses. The main power operation and planning constraints related to wind power integration are analysed and some solutions presented.
Keywords :
diesel-electric generators; hybrid power systems; power system planning; wind power; wind turbines; Brazil; diesel generators; electrical loss; hybrid power systems; hybrid wind-diesel system; planning constraints; power system planning; wind power; wind power integration; wind turbines; Hybrid power systems; Induction generators; Power generation; Power system planning; Power systems; Reactive power; Wind energy; Wind energy generation; Wind power generation; Wind turbines;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Transmission and Distribution Conference and Exposition: Latin America, 2004 IEEE/PES
Print_ISBN :
0-7803-8775-9
Type :
conf
DOI :
10.1109/TDC.2004.1432450
Filename :
1432450
Link To Document :
بازگشت