DocumentCode :
322976
Title :
MV network control integrated on the SCADA system
Author :
Albuquerque, R. ; Matos, L.
Author_Institution :
LTE/EDP, Portugal
Volume :
4
fYear :
1997
fDate :
1997
Firstpage :
42644
Abstract :
LTE-the Portuguese electric utility-has proceeded with an MV power system (30 kV and 10 kV) control scheme , according to a company strategy defined on the bases of better service quality provision to its clients and minimisation of interruption time. Using the present SCADA systems, open systems, integrated into a global information network, in corporation with other systems and with DMS applications (distribution management system), it was considered fundamental that the MV power network control should be integrated on the existing SCADA scheme in the distribution centres (DC). For the choice of the points on the network to be controlled, the authors have considered the network characteristics, the installed power, the type and number of clients, incident quantification, etc., for the determination of the most favourable technical/economical solution. As a communication support, they used several solutions, such as radio, dedicated telephone lines, commuted telephone lines or distribution line carriers (DLC), that aid the network control system in the command centre, and determine the location of the incident and isolate the affected network
Keywords :
power system control; MV power network control; Portugal; SCADA system; communication support; distribution management system; electric utility; failure location; power service quality;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Electricity Distribution. Part 1: Contributions. CIRED. 14th International Conference and Exhibition on (IEE Conf. Publ. No. 438)
Conference_Location :
Birmingham
ISSN :
0537-9989
Print_ISBN :
0-85296-674-1
Type :
conf
DOI :
10.1049/cp:19970560
Filename :
671664
Link To Document :
بازگشت