DocumentCode :
3231471
Title :
Battery aware tasks allocating algorithm for multi-battery operated system
Author :
Peng Ouyang ; Yin, Shouyi ; Liu, Leibo ; Wei, Shaojun
Author_Institution :
Inst. of Microelectron., Tsinghua Univ., Beijing, China
fYear :
2010
fDate :
6-9 Dec. 2010
Firstpage :
875
Lastpage :
878
Abstract :
Extending the lifetime of battery is a very important goal in battery-operated systems. The prior works of lifetime management mainly focused on single battery, multi-battery scheduling as another way of prolonging the battery lifetime is considered here. Battery Aware Tasks Allocating Algorithm (BATA) for multi-battery operated system is proposed in this paper. It extends the battery lifetime through making fully use of the idle time of battery scheduling which can reduce the charge loss since the recovery effect of battery. Experimental results indicate that BATA can achieve 15.67% ~ 25.43% reductions on the charge loss and 30.68%~55.63% gains of battery lifetime while maintains a low level computation complexity.
Keywords :
battery management systems; scheduling; battery aware tasks allocating algorithm; battery lifetime; battery-operated systems; charge loss; idle time; lifetime management; multibattery operated system; multibattery scheduling; recovery effect; Batteries; Indexes; BATA; lifetime management; multi-battery; recovery effect;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Circuits and Systems (APCCAS), 2010 IEEE Asia Pacific Conference on
Conference_Location :
Kuala Lumpur
Print_ISBN :
978-1-4244-7454-7
Type :
conf
DOI :
10.1109/APCCAS.2010.5774998
Filename :
5774998
Link To Document :
بازگشت