Title :
Parallel test tasks scheduling on multi-core platform
Author :
Lei Wang ; Jia-yong Fang ; Cheng-jin Gao
Author_Institution :
Eng. Sch. of the Air Force Eng., Univ. Xian, Xian
Abstract :
Aimed at the problem that traditional test program couldnpsilat effectively enhance the test efficiency, three decompose method which based on mission, data and data stream were brought forward to solve the test problem of parallel decompose. Multi-core technology was imported in parallel test platform to make the real time ability of the parallel mission improved. In order to work out the issue that test program based on single-core couldnpsilat utilize MCP technology effectively, schedule strategy of parallel test mission is advanced to optimize test flow and mission schedule. According to the result of experimentation, performance of plat based on MCP enhanced 30%~50% against single-core plat.
Keywords :
automatic testing; computerised instrumentation; parallel programming; multi core platform; parallel test platform; parallel test tasks scheduling; real time ability; Cities and towns; Computer architecture; Costs; Data engineering; Parallel processing; Processor scheduling; Software architecture; Software testing; System testing; Yarn; multi-core; parallel; parallel test; schedule strategy; test process;
Conference_Titel :
AUTOTESTCON, 2008 IEEE
Conference_Location :
Salt Lake Cirty, UT
Print_ISBN :
978-1-4244-2225-8
Electronic_ISBN :
1088-7725
DOI :
10.1109/AUTEST.2008.4662669