DocumentCode :
3237801
Title :
Quality improvement of wall energy conservation project based on PDCA cycle
Author :
Zhichun, Qiao ; Yuejun, Xiao
Author_Institution :
Sch. of Mech. & Civil Eng., China Univ. of Min. & Technol., Xuzhou, China
fYear :
2011
fDate :
22-24 April 2011
Firstpage :
1416
Lastpage :
1419
Abstract :
According to the PDCA cycle (Plan, Do, Check and Act), the common problems of wall energy conservation project construction were analyzed, and the pre-control measures to ensure construction quality were put forward and implemented carefully. Then, the process and the results of implementation were inspected according to measures, construction code and technical standards. Finaly, the results of inspection were analyzed and the problems checked out could be resolved during next cycles. The construction quality could be improved through every cycle.
Keywords :
building standards; construction industry; energy conservation; inspection; quality management; PDCA cycle; construction code; construction quality; inspection; plan, do, check and act; quality improvement; technical standards; wall energy conservation project; Energy efficiency; Heating; Inspection; Insulation; Mortar; Polymers; Construction quality; PDCA cycle; Quality control point; Quality improvement;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
Conference_Location :
Lushan
Print_ISBN :
978-1-4577-0289-1
Type :
conf
DOI :
10.1109/ICETCE.2011.5775312
Filename :
5775312
Link To Document :
بازگشت