• DocumentCode
    3238692
  • Title

    Performance evaluation and efficiency improvement for Jebba, Kainji and Shiroro hydro power schemes

  • Author

    Aminu, Maruf A. ; Kangiwa, Umar G.

  • Author_Institution
    Fed. Polytech. Birnin Kebbi, Birnin Kebbi, Nigeria
  • fYear
    2011
  • fDate
    24-26 Nov. 2011
  • Firstpage
    115
  • Lastpage
    118
  • Abstract
    In this paper an attempt is made to evaluate performance indices based on industry - wide practice and to suggest possible approach for improving the operational efficiencies of Jebba, Kainji and Shiroro hydro power generating stations. To actualize that, data including average daily gross operating head, daily flow rate and daily energy generated were obtained from Jebba, Kainji and Shiroro power stations and the National Control Center (N.C.C) Osogbo. From the energy (MWh) generated the average daily power generated (MW) was computed. Consequently, the average operational efficiencies of Jebba, Kainji and Shiroro hydro schemes were evaluated and found to be 89.43%, 88.45% and 94.03% respectively. Similarly, performance indicators including deemed generation, auxiliary energy consumption, availability factor, capacity index, workforce deployment, forced outage factor, scheduled outage factor and average production cost were evaluated and technical inferences made. The study was limited to the year 2010 due to non - availability of data for other years.
  • Keywords
    hydroelectric power stations; efficiency improvement; hydro power generating stations; performance evaluation; Availability; Benchmark testing; Conferences; Energy consumption; Indexes; Maintenance engineering; Power generation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Adaptive Science and Technology (ICAST), 2011 3rd IEEE International Conference
  • Conference_Location
    Abuja
  • Print_ISBN
    978-1-4673-0758-1
  • Type

    conf

  • DOI
    10.1109/ICASTech.2011.6145162
  • Filename
    6145162