• DocumentCode
    3238722
  • Title

    Resource allocation in a flexible manufacturing system by graph matching

  • Author

    Shen, Helen C. ; Hodgson, John A.B. ; Heppler, Glenn R.

  • Author_Institution
    Dept. of Syst. Design Eng., Waterloo Univ., Ont., Canada
  • fYear
    1991
  • fDate
    9-11 Apr 1991
  • Firstpage
    1315
  • Abstract
    Resource allocation in a flexible manufacturing system (FMS), such as assignment of resources to tasks, can be solved efficiently using graph matching methods. The FMS is modeled as a graph: the vertices are resources and tasks, and the edges ar relationships between the resources and tasks. Resources are allocated by finding a match in the graph. The general matching problem is reviewed as an optimization problem; the more specific maximum cardinality 1-matching problem is discussed in detail. A direct parallelization of an algorithm is described which may be regarded as an archetype for implementation on a distributed network of computers in a large FMS. In such an FMS, planning activities such as resource allocation are decentralized, allowing for quicker and more detailed planning
  • Keywords
    flexible manufacturing systems; graph theory; resource allocation; FMS; decentralized planning; graph matching; maximum cardinality 1-matching problem; optimization problem; resource allocation; tasks; Computer networks; Concurrent computing; Design engineering; Distributed computing; Flexible manufacturing systems; Production planning; Resource management; System recovery; Systems engineering and theory; Workstations;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Robotics and Automation, 1991. Proceedings., 1991 IEEE International Conference on
  • Conference_Location
    Sacramento, CA
  • Print_ISBN
    0-8186-2163-X
  • Type

    conf

  • DOI
    10.1109/ROBOT.1991.131794
  • Filename
    131794