• DocumentCode
    3238786
  • Title

    Super Arm working method [power distribution line maintenance]

  • Author

    Nakagawa, Masaru ; Andoh, Yasukazu ; Nezuka, Kenjiro ; Nakajima, Kiyoshi

  • Author_Institution
    Chubu Electric Power Co. Inc., Nagoya, Japan
  • fYear
    1995
  • fDate
    29 Oct-3 Nov 1995
  • Firstpage
    138
  • Lastpage
    141
  • Abstract
    This paper shows the “Super Arm” working method which is applied with hot sticks for live-line power distribution line maintenance work. This development study will be projected to future robotics work. The results as described in this paper show a substantial increase in productivity
  • Keywords
    distribution networks; human resource management; maintenance engineering; power overhead lines; Super Arm working method; development study; hot sticks; live-line work; power distribution line maintenance; productivity; robotics; Arm; Cable insulation; Costs; Power cable insulation; Power cables; Power transformer insulation; Productivity; Robots; Rubber; Switches;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Transmission and Distribution Construction and Live Line Maintenance, 1995. ESMO-95 Proceedings., Seventh International Conference on
  • Conference_Location
    Columbus, OH
  • Print_ISBN
    0-7803-2506-0
  • Type

    conf

  • DOI
    10.1109/TDCLLM.1995.485048
  • Filename
    485048