• DocumentCode
    3239267
  • Title

    Automation of Tacoma´s hydroelectric plants

  • Author

    Kirchmeier, Robert R. ; Orth, Joseph A.

  • fYear
    1995
  • fDate
    10-12 Oct. 1995
  • Firstpage
    196
  • Abstract
    This paper discusses the development of automation projects for hydroelectric generating facilities owned and operated by Tacoma Public Utilities (TPU), USA. This includes the background of plant operations and the recent implementation efforts that allowed TPU to operate all their hydro facilities in a fully unstaffed manner. Discussion of TPUs near term plans for installing a new SCADA system and integration with present hydroplant control systems is also included
  • Keywords
    Automatic control; Automation; Centralized control; Communication system control; Control systems; Costs; Humans; Hydroelectric power generation; Rivers; SCADA systems;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Northcon 95. I EEE Technical Applications Conference and Workshops Northcon95
  • Conference_Location
    Portland, OR, USA
  • Print_ISBN
    0-7803-2639-3
  • Type

    conf

  • DOI
    10.1109/NORTHC.1995.485072
  • Filename
    485072