DocumentCode :
3239559
Title :
Sinking construction technology for large steel cofferdam in strong tide river part
Author :
Yuan Min ; Guo Ping ; Wang Zhe
Author_Institution :
Eng. Dept., Hangzhou Municipal Urban Infrastruct. Dev. Co., Hangzhou, China
fYear :
2011
fDate :
22-24 April 2011
Firstpage :
2579
Lastpage :
2582
Abstract :
In strong tide river part, large steel cofferdam sinking construction is complex, and cannot foresight under strong tidal influence. Deviation is prone to occur in sinking process, and rectifying deviation is very hard to do, which will influence the follow-up cushion cap construction quality control to a certain extent. The sinking construction technology for bottomless double wall large steel cofferdam is introduced in the paper, which provides valuable experience for the sinking construction of similar projects in future.
Keywords :
construction; quality control; steel; bottomless-double-wall large-steel cofferdam; follow-up cushion cap construction quality control; rectifying deviation; sinking construction technology; strong-tide river part; Bridges; Companies; Rail transportation; Rivers; Road transportation; Steel; Tides; large scale; sinking construction; steel cofferdam; strong tide;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
Conference_Location :
Lushan
Print_ISBN :
978-1-4577-0289-1
Type :
conf
DOI :
10.1109/ICETCE.2011.5775398
Filename :
5775398
Link To Document :
بازگشت