Title :
Sinking construction technology for large steel cofferdam in strong tide river part
Author :
Yuan Min ; Guo Ping ; Wang Zhe
Author_Institution :
Eng. Dept., Hangzhou Municipal Urban Infrastruct. Dev. Co., Hangzhou, China
Abstract :
In strong tide river part, large steel cofferdam sinking construction is complex, and cannot foresight under strong tidal influence. Deviation is prone to occur in sinking process, and rectifying deviation is very hard to do, which will influence the follow-up cushion cap construction quality control to a certain extent. The sinking construction technology for bottomless double wall large steel cofferdam is introduced in the paper, which provides valuable experience for the sinking construction of similar projects in future.
Keywords :
construction; quality control; steel; bottomless-double-wall large-steel cofferdam; follow-up cushion cap construction quality control; rectifying deviation; sinking construction technology; strong-tide river part; Bridges; Companies; Rail transportation; Rivers; Road transportation; Steel; Tides; large scale; sinking construction; steel cofferdam; strong tide;
Conference_Titel :
Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
Conference_Location :
Lushan
Print_ISBN :
978-1-4577-0289-1
DOI :
10.1109/ICETCE.2011.5775398