• DocumentCode
    3239559
  • Title

    Sinking construction technology for large steel cofferdam in strong tide river part

  • Author

    Yuan Min ; Guo Ping ; Wang Zhe

  • Author_Institution
    Eng. Dept., Hangzhou Municipal Urban Infrastruct. Dev. Co., Hangzhou, China
  • fYear
    2011
  • fDate
    22-24 April 2011
  • Firstpage
    2579
  • Lastpage
    2582
  • Abstract
    In strong tide river part, large steel cofferdam sinking construction is complex, and cannot foresight under strong tidal influence. Deviation is prone to occur in sinking process, and rectifying deviation is very hard to do, which will influence the follow-up cushion cap construction quality control to a certain extent. The sinking construction technology for bottomless double wall large steel cofferdam is introduced in the paper, which provides valuable experience for the sinking construction of similar projects in future.
  • Keywords
    construction; quality control; steel; bottomless-double-wall large-steel cofferdam; follow-up cushion cap construction quality control; rectifying deviation; sinking construction technology; strong-tide river part; Bridges; Companies; Rail transportation; Rivers; Road transportation; Steel; Tides; large scale; sinking construction; steel cofferdam; strong tide;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
  • Conference_Location
    Lushan
  • Print_ISBN
    978-1-4577-0289-1
  • Type

    conf

  • DOI
    10.1109/ICETCE.2011.5775398
  • Filename
    5775398