DocumentCode :
3239567
Title :
HSE integration procedure management during the construction of the pipe engineering
Author :
Gao, Qing-Xuan ; Guo, Cheng ; Yi, Shu-ping ; Li, Jian ; Tao, Zhi-Jiang
Author_Institution :
Coll. of Mech. Eng., Chongqing Univ., Chongqing, China
fYear :
2010
fDate :
29-31 Oct. 2010
Firstpage :
1819
Lastpage :
1822
Abstract :
During the construction of the pipe engineering, HSE (Health, Safety and Environment) management and quality control influences safe operation in the period of the operation directly, PetroChina adopts Project Management Team, PMT, Project Management Contractor, Engineering Procurement PMC and Construction, EPC(PMT+PMC+EPC) combined management mode to make sure the effect control during the construction of the pipe engineering. Aimed at the artificial procedure´s breaking by the discrepancy of the participants´ benefit in this mode for the hard controlling of the HSE and quality, the article brings out procedure integrating management framework based on the whole life period of the pipe engineering, and builds the procedure´s hierarchical model and integrating management whole procedure of the pipe engineering. At last, the article gives the case verifying the method is available.
Keywords :
construction; health and safety; pipelines; procurement; project management; quality control; HSE integration procedure management; PetroChina; engineering procurement; integrated management framework; pipe engineering; procedure hierarchical model; project management contractor; project management team; quality control; safe operation; integration; long pipe line engineering; procedure management;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management (IE&EM), 2010 IEEE 17Th International Conference on
Conference_Location :
Xiamen
Print_ISBN :
978-1-4244-6483-8
Type :
conf
DOI :
10.1109/ICIEEM.2010.5645909
Filename :
5645909
Link To Document :
بازگشت