• DocumentCode
    324142
  • Title

    Schedule execution using perturbation analysis

  • Author

    Bongaerts, Luc ; Van Brussel, Hendrik ; Valckenaers, Paul

  • Author_Institution
    Dept. of Mech. Eng., Katholieke Univ., Leuven, Belgium
  • Volume
    3
  • fYear
    1998
  • fDate
    16-20 May 1998
  • Firstpage
    2747
  • Abstract
    In a holonic shop floor control (SFC) architecture, a reactive scheduler co-operates with an autonomous online SFC system to combine high performance with reactivity against disturbances. To take its decisions, the online SFC system uses the existing schedule as advice. This “schedule execution” (SE) problem is not trivial, because the decisions taken by the online SFC system are local decisions in a combinatorial optimisation problem. By representing the schedule as a graph, this paper presents an algorithm for SE, based on perturbation analysis. It tackles the nonlinearities in the production system by a combination of linearisation and feedback control
  • Keywords
    feedback; manufacturing data processing; operations research; optimisation; perturbation techniques; production control; real-time systems; combinatorial optimisation; feedback; holonic shop floor control; linearisation; perturbation analysis; production control; reactive scheduling; Algorithm design and analysis; Control systems; Dynamic scheduling; Intelligent robots; Job shop scheduling; Manufacturing; Mechanical engineering; Optimal scheduling; Robustness; Scheduling algorithm;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Robotics and Automation, 1998. Proceedings. 1998 IEEE International Conference on
  • Conference_Location
    Leuven
  • ISSN
    1050-4729
  • Print_ISBN
    0-7803-4300-X
  • Type

    conf

  • DOI
    10.1109/ROBOT.1998.680761
  • Filename
    680761