DocumentCode :
3243245
Title :
Optimal reactive power planning with facts devices by particle swarm technique
Author :
Auchariyamet, S. ; Sirisumrannukul, S.
Author_Institution :
King Mongkut´s University of Technology North Bangkok, Thailand
fYear :
2009
fDate :
8-11 Nov. 2009
Firstpage :
1
Lastpage :
6
Abstract :
Reactive power planning by optimal allocation of static VAr compensator (SVC) and thyristor controlled series capacitor (TCSC) is presented in this paper. Three objective functions (minimization of the installation cost of SVC or TCSC, minimization of the energy loss cost, and minimization of the total cost defined as the sum of the installation cost and energy loss cost) are considered for comparison purpose. All the objective functions are subject to power flow equations, bus voltage limits, reactive power output of generators at voltage controlled buses, and limits of setting values for SVC and TCSC. An optimization technique based on particle swarm optimization (PSO) algorithm is developed to determine the optimal locations of SVC and TCSC and their corresponding setting values. A case study with a modified IEEE 14-bus system is carried out to demonstrate the effectiveness of the proposed technique. It is found that the obtained optimal solutions meet the requirement of the objective functions while satisfying all the constraints. Numerical results for total real and reactive power losses, energy loss cost, installation cost, and total cost are also discussed.
fLanguage :
English
Publisher :
iet
Conference_Titel :
Advances in Power System Control, Operation and Management (APSCOM 2009), 8th International Conference on
Conference_Location :
Hong Kong, China
Type :
conf
DOI :
10.1049/cp.2009.1792
Filename :
5526340
Link To Document :
بازگشت