• DocumentCode
    3245836
  • Title

    Foundation gap and crack analysis of airport pavement under-crossed by large slurry shield

  • Author

    Gaofei, Qiu ; Shaoming, Liao ; Yaoyao, Fan ; Zicong, Cheng

  • Author_Institution
    Dept. of Ggeotechnical Eng., Tongji Univ., Shanghai, China
  • fYear
    2011
  • fDate
    22-24 April 2011
  • Firstpage
    3185
  • Lastpage
    3190
  • Abstract
    Uneven settlement induced by the construction of shield tunnel crossing under airport pavement will influence the structure behavior of pavement inevitably. Excessive differential settlement will even lead to cracks on the pavement and gaps between foundation and pavement. Beside, it is difficult for large diameter shield to control face support pressure and likely to cause local collapse which is lethal to tunnel constuction and overlying pavement. Combined with the engineering practice of Xianxia west road tunnel, this paper analyzes the range of gaps and cracks under different ground volumn loss by numerical simulation, which lays a theoretical basis for defining allowable deformation of airport pavement during shield crossing.
  • Keywords
    cracks; deformation; foundations; numerical analysis; roads; tunnels; Xianxia west road tunnel; airport pavement; crack analysis; deformation; differential settlement; face support pressure; foundation; gap analysis; ground volumn loss; large-slurry shield; local collapse; numerical simulation; pavement structure behavior; shield crossing; shield tunnel construction; Airports; Numerical simulation; Roads; Slurries; Soil; Stress; gaps and cracks; ground volumn loss; shield crossing; under airport pavement;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
  • Conference_Location
    Lushan
  • Print_ISBN
    978-1-4577-0289-1
  • Type

    conf

  • DOI
    10.1109/ICETCE.2011.5775700
  • Filename
    5775700