DocumentCode
3247404
Title
Study of payment scheduling optimization with generalized precedence relations in the progress payment model
Author
Pang, Nansheng ; Zhang, Yi ; Huang, Hui
Author_Institution
Coll. of Econ. & Manage., North China Electr. Power Univ., Beijing, China
fYear
2010
fDate
20-21 Oct. 2010
Firstpage
421
Lastpage
423
Abstract
Based on the consideration of the client and the contractor´s joint project profit, a compromise thought that both the client and the contractor deviate from their respective ideal solutions by an equal percentage is proposed, an optimization model of payment scheduling with generalized precedence relations in the progress payment model is constructed. Ultimately, an example is given to demonstrate the effectiveness and practicality of the optimal model.
Keywords
financial management; optimisation; scheduling; client-contractor joint project profit; generalized precedence relations; payment scheduling optimization model; progress payment model; Europe; Processor scheduling; Generalized Precedence Relations; Multiple Mode of Activity; Payment Scheduling; Progress Payments;
fLanguage
English
Publisher
ieee
Conference_Titel
Knowledge Acquisition and Modeling (KAM), 2010 3rd International Symposium on
Conference_Location
Wuhan
Print_ISBN
978-1-4244-8004-3
Type
conf
DOI
10.1109/KAM.2010.5646275
Filename
5646275
Link To Document