DocumentCode :
3248022
Title :
A modern heuristic optimization method for AGC performance assessment at a power plant level
Author :
Shimin Yi ; Qingsong Chen ; Minghui Chen ; Wen, Fushuan
Author_Institution :
School of Electrical Engineering, South China University of Technology, Guangzhou 510640, China
fYear :
2009
fDate :
8-11 Nov. 2009
Firstpage :
1
Lastpage :
6
Abstract :
In China Southern Power Grid, the well-developed Control Performance Standard (CPS) is employed to assess the AGC operation performance of the dispatch centers at the provincial level, and on this basis an economic penalty mechanism is established. Given this background, by adding a capacity coefficient to the CPS formulas, the CPS assessment method is extended to accommodate generation units, and a new approach for assessing the AGC operation performance of generation units developed. The penalty for each provincial dispatch center, in the form of electricity amount, is then allocated to the generation units based on the assessment outcomes, and as a result, this could provide an efficient incentive for those units to improve their AGC operation performance. The proposed approach is consistent with the existing CPS assessment framework, and its emphasis is placed on the long-term AGC operation performance of the generation units. In this way, the AGC dynamic operation indices, such as the regulation rates and regulation accuracy, are not required, and hence the method could be implemented easily in actual power systems.
Keywords :
AGC Operation Performance Assessment; Automatic Generation Control (AGC); Control Performance Standard (CPS); Generation Units;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Advances in Power System Control, Operation and Management (APSCOM 2009), 8th International Conference on
Conference_Location :
Hong Kong, China
Type :
conf
DOI :
10.1049/cp.2009.1859
Filename :
5528297
Link To Document :
بازگشت