• DocumentCode
    3250583
  • Title

    Smart operation of a mobile network in event of disaster

  • Author

    Hofmann, Ralf D.

  • Author_Institution
    Nokia Siemens Networks, Radio Access, Ulm
  • fYear
    2008
  • fDate
    14-18 Sept. 2008
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    In the event of a natural disaster, mobile networks are expected to provide an added value to search and rescue operations. However, these networks and their services are not optimized with the requirements for this support in mind. A critical aspect is the need for several hours of backup power availability, something not usually required during AC grid outages resulting from other technical reasons. The availability of the maximum possible number of parallel emergency and voice calls during a disaster is ensured when the Operation & Maintenance Center reconfigures the network in accordance with a pre-defined emergency plan via a smart SW package. This also guarantees minimized power consumption by the basestations. The nature of the actual threat determines how the network has to be configured. Features such as prioritization of services and shut-down of hardware resources are part of this SW package and run automatically according to the pre-defined boundary conditions. The adaptation of HW-resources to the traffic situation can reduce the required battery backup capacity up to 30% in comparison to normal operation and for a given time period which has to be bridged. In combination with new battery technologies like Li-Polymer, which promise high energy densities, smaller and lighter battery backup devices can be realized in the future. Higher integration of digital components and advancements in power amplifier technology will yield a further reduction in basestation power consumption by up to 40% in the next two to three years, more or less independently of the mobile communication standard. Therefore, for low capacity basestations in rural areas, a battery capacity below 5 kWh (105 Ah @ -48 V DC) will be sufficient for eight hours of backup operation. For these applications, it will be feasible from a volume and cost point of view to omit combustion generation sets as emergency power sources.
  • Keywords
    emergency power supply; mobile radio; power grids; telecommunication power supplies; AC grid outages; backup power availability; mobile network; smart operation; Batteries; Boundary conditions; Communication standards; Costs; Energy consumption; Hardware; High power amplifiers; Mobile communication; Packaging; Telecommunication traffic;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Telecommunications Energy Conference, 2008. INTELEC 2008. IEEE 30th International
  • Conference_Location
    San Diego, CA
  • Print_ISBN
    978-1-4244-2055-1
  • Electronic_ISBN
    978-1-4244-2056-8
  • Type

    conf

  • DOI
    10.1109/INTLEC.2008.4664066
  • Filename
    4664066