    Improvement for traditional PERT based on rational risk aversion

  • Author

    Jian, Ying-Hui ; Zhang, Yong

  • Author_Institution
    Bus. Sch., Hohai Univ., Nanjing, China
  • fYear
    2010
  • fDate
    29-31 Oct. 2010
  • Firstpage
    766
  • Lastpage
    769
  • Abstract
    Because of the rational circumvent of the perceived risks and the extended responsibility, project schedule always tend to be conservative, which may cause more waste of safety time in the implementation of projects, and make project management inefficient and cost over-run. This paper introduces a “compensation factor”, which is applied to amend activity durations in traditional PERT in order to make the project schedule more practical. By this method, we can shorten the calculated duration and cumulate all “compensation factor” as a buffer time, which will be put it at the end of the critical path. This new method can help project managers to make a flexible use of the duration of each activity.
  • Keywords
    PERT; project management; risk management; safety; project management; project schedule; rational risk aversion; safety time; traditional PERT; Industries; Traditional PERT; compensation factor; conservative decision-making;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management (IE&EM), 2010 IEEE 17Th International Conference on
  • Conference_Location
    Xiamen
  • Print_ISBN
    978-1-4244-6483-8
  • Type

    conf

  • DOI
    10.1109/ICIEEM.2010.5646510
  • Filename
    5646510