Improvement for traditional PERT based on rational risk aversion
Author :
Jian, Ying-Hui ; Zhang, Yong
Author_Institution :
Bus. Sch., Hohai Univ., Nanjing, China
fYear :
2010
fDate :
29-31 Oct. 2010
Firstpage :
766
Lastpage :
769
Abstract :
Because of the rational circumvent of the perceived risks and the extended responsibility, project schedule always tend to be conservative, which may cause more waste of safety time in the implementation of projects, and make project management inefficient and cost over-run. This paper introduces a “compensation factor”, which is applied to amend activity durations in traditional PERT in order to make the project schedule more practical. By this method, we can shorten the calculated duration and cumulate all “compensation factor” as a buffer time, which will be put it at the end of the critical path. This new method can help project managers to make a flexible use of the duration of each activity.
Keywords :
PERT; project management; risk management; safety; project management; project schedule; rational risk aversion; safety time; traditional PERT; Industries; Traditional PERT; compensation factor; conservative decision-making;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management (IE&EM), 2010 IEEE 17Th International Conference on
Conference_Location :
Xiamen
Print_ISBN :
978-1-4244-6483-8
Type :
conf
DOI :
10.1109/ICIEEM.2010.5646510
Filename :
5646510
Link To Document :
بازگشت