• DocumentCode
    3251628
  • Title

    An integrated dual resource management and production planning system

  • Author

    Xu, J. ; Xu, X. ; Xie, S.Q.

  • Author_Institution
    Dept. of Mech. Eng., Univ. of Auckland, Auckland, New Zealand
  • fYear
    2010
  • fDate
    29-31 Oct. 2010
  • Firstpage
    728
  • Lastpage
    732
  • Abstract
    Dual resource constrained (DRC) systems are those with capacity constraints which stem from both machines and human operators. Such systems are prevalent in real-life industries and resource planning must acknowledge the unique characteristics inherent in different types of resources in order to provide optimal schedules. In particular, the inclusion and consideration of human characteristics is necessary to allow more accurate depictions of realistic situations. This paper proposes an integrated dual resource management and production planning system that is able to evaluate the combined effects of numerous worker related issues such as capability, efficiency and reliability. The resultant information can then be used to produce a set of optimised schedules accordingly. The proposed system will be module based to provide flexibility and allow easy customization to suit different industry needs.
  • Keywords
    enterprise resource planning; human factors; production planning; scheduling; dual resource constrained system; industries planning; integrated dual resource management; production planning system; resource planning; Databases; Reliability; Schedules; Testing; Training; DRC; Dual Resource Constrained; Production Planning; Resource Management; Scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management (IE&EM), 2010 IEEE 17Th International Conference on
  • Conference_Location
    Xiamen
  • Print_ISBN
    978-1-4244-6483-8
  • Type

    conf

  • DOI
    10.1109/ICIEEM.2010.5646518
  • Filename
    5646518