DocumentCode :
3251628
Title :
An integrated dual resource management and production planning system
Author :
Xu, J. ; Xu, X. ; Xie, S.Q.
Author_Institution :
Dept. of Mech. Eng., Univ. of Auckland, Auckland, New Zealand
fYear :
2010
fDate :
29-31 Oct. 2010
Firstpage :
728
Lastpage :
732
Abstract :
Dual resource constrained (DRC) systems are those with capacity constraints which stem from both machines and human operators. Such systems are prevalent in real-life industries and resource planning must acknowledge the unique characteristics inherent in different types of resources in order to provide optimal schedules. In particular, the inclusion and consideration of human characteristics is necessary to allow more accurate depictions of realistic situations. This paper proposes an integrated dual resource management and production planning system that is able to evaluate the combined effects of numerous worker related issues such as capability, efficiency and reliability. The resultant information can then be used to produce a set of optimised schedules accordingly. The proposed system will be module based to provide flexibility and allow easy customization to suit different industry needs.
Keywords :
enterprise resource planning; human factors; production planning; scheduling; dual resource constrained system; industries planning; integrated dual resource management; production planning system; resource planning; Databases; Reliability; Schedules; Testing; Training; DRC; Dual Resource Constrained; Production Planning; Resource Management; Scheduling;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management (IE&EM), 2010 IEEE 17Th International Conference on
Conference_Location :
Xiamen
Print_ISBN :
978-1-4244-6483-8
Type :
conf
DOI :
10.1109/ICIEEM.2010.5646518
Filename :
5646518
Link To Document :
بازگشت