    Probabilistic planning reserve margin studies at the California ISO

  • Author

    Le, David ; Chowdhury, Ali

  • Author_Institution
    Regional Transm., California ISO, Folsom, CA, USA
  • fYear
    2010
  • fDate
    14-17 June 2010
  • Firstpage
    402
  • Lastpage
    406
  • Abstract
    This paper provides an overview of probabilistic planning reserve margin studies at the California Independent System Operator. Currently, load serving entities in the State of California, with its retail load under the jurisdiction of the California Public Utility Commission, are required to procure reserve level at 15 - 17 percent. However, the requirement is deterministic in nature. The California Independent System Operator, which controls 80 percent of the state´s electrical load, is investigating the use of probabilistic planning for planning reserve margin of the load serving entities under its operational control. The study results are shared with the California Public Utility Commission and the California Energy Commission for consideration of using the probabilistic PRM in the future.
  • Keywords
    load management; power system planning; probability; California Energy Commission; California ISO; California independent system operator; electrical load planning; load-serving entities; probabilistic planning reserve margin; Collaboration; Control systems; Councils; Helium; ISO; Maintenance; Mars; Power generation economics; Reliability; CAISO; CEC; CPUC; IOUs; Monte Carlo Simulation; Planning Reserve Margin; Transmission Planning;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Probabilistic Methods Applied to Power Systems (PMAPS), 2010 IEEE 11th International Conference on
  • Conference_Location
    Singapore
  • Print_ISBN
    978-1-4244-5720-5
  • Type

    conf

  • DOI
    10.1109/PMAPS.2010.5528956
  • Filename
    5528956