Title
Probabilistic planning reserve margin studies at the California ISO
Author
Le, David ; Chowdhury, Ali
Author_Institution
Regional Transm., California ISO, Folsom, CA, USA
fYear
2010
fDate
14-17 June 2010
Firstpage
402
Lastpage
406
Abstract
This paper provides an overview of probabilistic planning reserve margin studies at the California Independent System Operator. Currently, load serving entities in the State of California, with its retail load under the jurisdiction of the California Public Utility Commission, are required to procure reserve level at 15 - 17 percent. However, the requirement is deterministic in nature. The California Independent System Operator, which controls 80 percent of the state´s electrical load, is investigating the use of probabilistic planning for planning reserve margin of the load serving entities under its operational control. The study results are shared with the California Public Utility Commission and the California Energy Commission for consideration of using the probabilistic PRM in the future.
Keywords
load management; power system planning; probability; California Energy Commission; California ISO; California independent system operator; electrical load planning; load-serving entities; probabilistic planning reserve margin; Collaboration; Control systems; Councils; Helium; ISO; Maintenance; Mars; Power generation economics; Reliability; CAISO; CEC; CPUC; IOUs; Monte Carlo Simulation; Planning Reserve Margin; Transmission Planning;
fLanguage
English
Publisher
ieee
Conference_Titel
Probabilistic Methods Applied to Power Systems (PMAPS), 2010 IEEE 11th International Conference on
Conference_Location
Singapore
Print_ISBN
978-1-4244-5720-5
Type
conf
DOI
10.1109/PMAPS.2010.5528956
Filename
5528956
Link To Document