DocumentCode :
3254095
Title :
Discrete-Event Simulation (DES) of uncertainty-based time-cost trade-off analysis
Author :
Li, Hong-Xian ; Lei, Zhen
Author_Institution :
Dept. of Eng. Econ. & Manage., Hohai Univ., Nanjing, China
fYear :
2010
fDate :
29-31 Oct. 2010
Firstpage :
196
Lastpage :
199
Abstract :
Critical Path Method (CPM) is widely used in construction engineering scheduling. Through calculating Early Start (ES), Early Finish (EF), Late Start (LS), and Late Finish (LF), the duration of a project can be obtained, and critical path can be found. However, in reality, the duration of each activity is uncertain with a distribution, instead of a constant number. Meanwhile, the cost of each activity may vary when the duration of the activity changes, generating different Net Present Value (NPV). In this paper, a Discrete-Event Simulation (DES) methodology is introduced to deal with the uncertainty-based time-cost trade-off (TCT) analysis in construction scheduling problem. An example is stated to verify the proposed methodology.
Keywords :
civil engineering; critical path analysis; discrete event simulation; scheduling; CPM; DES methodology; NPV; TCT analysis; construction engineering scheduling; critical path method; discrete-event simulation; net present value; uncertainty-based time-cost trade-off analysis; Computational modeling; Indexes; Schedules; Discrete-Event Simulation (DES); Net Present Value (NPV); Time-Cost Trade-off (TCT);
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management (IE&EM), 2010 IEEE 17Th International Conference on
Conference_Location :
Xiamen
Print_ISBN :
978-1-4244-6483-8
Type :
conf
DOI :
10.1109/ICIEEM.2010.5646648
Filename :
5646648