Application of bio-contact oxidation process as pretreatment technology to constructed wetland
Author
Niu, Zhi-Guang ; Bai, Jia-Qi ; Zhang, Ying ; Mi Zi-Ming ; Sun, Jie ; Wang, Fang
Author_Institution
Sch. of Environ. Sci. & Eng., Tianjin Univ., Tianjin, China
fYear
2011
fDate
22-24 April 2011
Firstpage
3904
Lastpage
3907
Abstract
In this article, bio-contact oxidation process was applied as pretreatment process to constructed wetland for solving clogging, the main problem of constructed wetland. After 50 days test, the work condition was chosen, and the stability of the COD and SS removal rate was examined. The results showed that with the HRT of 6h and aeration concentration of 0.25m3/h, the average removal rate for COD and SS reached 49% and 38% respectively. The goal of retarding the clogging of constructed wetland was achieved.
Keywords
biotechnology; oxidation; COD removal rate; HRT; SS removal rate; aeration concentration; biocontact oxidation process; clogging; constructed wetland pretreatment technology; time 6 h; Educational institutions; Effluents; Electronic mail; Manuals; Oxidation; Wastewater; Water pollution; bio-contact oxidation process; clogging; constructed wetland; pretreatment;
fLanguage
English
Publisher
ieee
Conference_Titel
Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
Conference_Location
Lushan
Print_ISBN
978-1-4577-0289-1
Type
conf
DOI
10.1109/ICETCE.2011.5776213
Filename
5776213
Link To Document