Title :
Application of bio-contact oxidation process as pretreatment technology to constructed wetland
Author :
Niu, Zhi-Guang ; Bai, Jia-Qi ; Zhang, Ying ; Mi Zi-Ming ; Sun, Jie ; Wang, Fang
Author_Institution :
Sch. of Environ. Sci. & Eng., Tianjin Univ., Tianjin, China
Abstract :
In this article, bio-contact oxidation process was applied as pretreatment process to constructed wetland for solving clogging, the main problem of constructed wetland. After 50 days test, the work condition was chosen, and the stability of the COD and SS removal rate was examined. The results showed that with the HRT of 6h and aeration concentration of 0.25m3/h, the average removal rate for COD and SS reached 49% and 38% respectively. The goal of retarding the clogging of constructed wetland was achieved.
Keywords :
biotechnology; oxidation; COD removal rate; HRT; SS removal rate; aeration concentration; biocontact oxidation process; clogging; constructed wetland pretreatment technology; time 6 h; Educational institutions; Effluents; Electronic mail; Manuals; Oxidation; Wastewater; Water pollution; bio-contact oxidation process; clogging; constructed wetland; pretreatment;
Conference_Titel :
Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
Conference_Location :
Lushan
Print_ISBN :
978-1-4577-0289-1
DOI :
10.1109/ICETCE.2011.5776213