Risk analysis of EPC project based on ISM
Author
Yu, Ning ; Wang, Yanfeng
Author_Institution
10th Constr. & Installation Co., Yanjian Group Co., Ltd., Yantai, China
fYear
2011
fDate
8-10 Aug. 2011
Firstpage
151
Lastpage
154
Abstract
A number of qualitative and quantitative risk analysis methods have a current problem which is lack of systematization and strategy in risk analysis. It is necessary for EPC project to clear the relationship among different risks before risks appear because the probability of some risk may be changed if one risk event occurred. Aiming at this, Interpretive Structural Modeling (ISM) method which is the most effective solution for the problem was introduced into the risk analysis of EPC project. 11 main risks of the EPC contractors summarized via group brainstorming were assessed by ISM method. Then a Risk-Structure-Figure was set up which shows a clear relationship among the 11 risks. The conclusion is of great value to the quantitative risk analysis, such as Analytical Hierarchy Process (AHP), etc.
Keywords
construction; contracts; decision making; procurement; project management; risk analysis; AHP; EPC contractors; EPC project; ISM; ISM method; analytical hierarchy process; engineering procurement and construction; interpretive structural modeling; qualitative risk analysis; quantitative risk analysis; Analytical models; Contracts; Law; Matrix decomposition; Procurement; Risk management; “Engineering, Procurement and Construction” (EPC); Interpretive Structural Modeling (ISM); Risk Management;
fLanguage
English
Publisher
ieee
Conference_Titel
Emergency Management and Management Sciences (ICEMMS), 2011 2nd IEEE International Conference on
Conference_Location
Beijing
Print_ISBN
978-1-4244-9665-5
Type
conf
DOI
10.1109/ICEMMS.2011.6015642
Filename
6015642
Link To Document