DocumentCode
3258792
Title
Application of Analytic Hierarchy Process in large span and shallow buried highway tunnel construction risk recognition
Author
Yuan, Cheng ; Guang-yin, Du ; Guo-jun, Cai ; Li-yuan, Tong
Author_Institution
Inst. of Geotechnical Eng., Southeast Univ., Nanjing, China
fYear
2011
fDate
22-24 April 2011
Firstpage
3897
Lastpage
3900
Abstract
Recently there has been rapid development of large-span and shallow-buried highway tunnel construction and considerable risk appear, the urgent issues are that how to identify effectively risk factors which in the process of tunnel construction. With the review of disadvantages of risk recognition methods, the risk hierarchical structure for construction of the tunnel was established using the Analytic Hierarchy Process in a tunnel construction site, the synthesis weights of each basic risk event and weights of factors which cause these basic risk events were calculated. A risk recognition model of large-span and shallow-buried highway tunnel construction was established.
Keywords
decision making; geotechnical engineering; risk analysis; road building; tunnels; analytic hierarchy process; large span highway tunnel construction; risk events; risk factors; risk recognition; shallow buried highway tunnel construction; synthesis weights; Geology; Lead; Risk management; Road transportation; Stability analysis; Tunneling; Analytic Hierarchy Process; highway tunnel; large-span and shallow-buried; risk recognition;
fLanguage
English
Publisher
ieee
Conference_Titel
Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
Conference_Location
Lushan
Print_ISBN
978-1-4577-0289-1
Type
conf
DOI
10.1109/ICETCE.2011.5776338
Filename
5776338
Link To Document