• DocumentCode
    3260170
  • Title

    Notice of Retraction
    Feasibility and approach of developing producer service in Liaoning province

  • Author

    Lu Xi ; Li Yuanyuan ; Pang Hongmei

  • Author_Institution
    Sch. of Manage., Shenyang Univ. of Technol., Shenyang, China
  • fYear
    2011
  • fDate
    8-10 Aug. 2011
  • Firstpage
    740
  • Lastpage
    743
  • Abstract
    Notice of Retraction

    After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.

    We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.

    The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.

    The producer service, as the intermediate input of manufactures, possesses the important effect for reviving of Liaoning old industrial base. Based on the relationship between producer service and manufacture, the developing situation in both producer service and manufacture of Liaoning province as well as the problems during the development were analyzed. The feasibility to develop producer service in Liaoning province was proved. And finally, the approach of developing producer service was proposed.
  • Keywords
    manufacturing systems; production management; Liaoning province; manufacturing system; producer service; Cities and towns; Finance; Industries; Logistics; Manufacturing; Liaoning; approach; equipment manufacture; feasibility; producer service;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Emergency Management and Management Sciences (ICEMMS), 2011 2nd IEEE International Conference on
  • Conference_Location
    Beijing
  • Print_ISBN
    978-1-4244-9665-5
  • Type

    conf

  • DOI
    10.1109/ICEMMS.2011.6015788
  • Filename
    6015788