• DocumentCode
    3261822
  • Title

    Winter construction of concrete for high-rise frame-shearwall structure in cold areas

  • Author

    Lv, Chun

  • Author_Institution
    Sch. of Archit. & Civil Eng., Qiqihar Univ., Qiqihar, China
  • fYear
    2011
  • fDate
    22-24 April 2011
  • Firstpage
    5678
  • Lastpage
    5680
  • Abstract
    Combined with high-rise frame-shearwall building of the International Education Center Project, Qiqihar University, it introduces winter construction process and winter maintenance, check calculating temperature of concrete according to Specification for Winter Construction of Building Engineering, which can be referred for construction of concrete in winter. The winter construction method of concrete structure is summarized in the severe cold region. The basic principles of comprehensive thermos method are described for the reinforced concrete structure in winter. The winter construction measures are defined further, such as reinforced works, the formwork works, in particular concrete works.
  • Keywords
    building standards; climatology; reinforced concrete; structural engineering; walls; Qiqihar University; cold areas; high rise frame shearwall building; reinforced concrete structures; specification for winter construction of building engineering; thermos method; winter construction process; winter maintenance; Architecture; Concrete; Educational institutions; Maintenance engineering; Presses; cold area; comprehensive thermos method; frame-shearwall structure; winter construction;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
  • Conference_Location
    Lushan
  • Print_ISBN
    978-1-4577-0289-1
  • Type

    conf

  • DOI
    10.1109/ICETCE.2011.5776472
  • Filename
    5776472