DocumentCode
3261822
Title
Winter construction of concrete for high-rise frame-shearwall structure in cold areas
Author
Lv, Chun
Author_Institution
Sch. of Archit. & Civil Eng., Qiqihar Univ., Qiqihar, China
fYear
2011
fDate
22-24 April 2011
Firstpage
5678
Lastpage
5680
Abstract
Combined with high-rise frame-shearwall building of the International Education Center Project, Qiqihar University, it introduces winter construction process and winter maintenance, check calculating temperature of concrete according to Specification for Winter Construction of Building Engineering, which can be referred for construction of concrete in winter. The winter construction method of concrete structure is summarized in the severe cold region. The basic principles of comprehensive thermos method are described for the reinforced concrete structure in winter. The winter construction measures are defined further, such as reinforced works, the formwork works, in particular concrete works.
Keywords
building standards; climatology; reinforced concrete; structural engineering; walls; Qiqihar University; cold areas; high rise frame shearwall building; reinforced concrete structures; specification for winter construction of building engineering; thermos method; winter construction process; winter maintenance; Architecture; Concrete; Educational institutions; Maintenance engineering; Presses; cold area; comprehensive thermos method; frame-shearwall structure; winter construction;
fLanguage
English
Publisher
ieee
Conference_Titel
Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
Conference_Location
Lushan
Print_ISBN
978-1-4577-0289-1
Type
conf
DOI
10.1109/ICETCE.2011.5776472
Filename
5776472
Link To Document