DocumentCode :
3261822
Title :
Winter construction of concrete for high-rise frame-shearwall structure in cold areas
Author :
Lv, Chun
Author_Institution :
Sch. of Archit. & Civil Eng., Qiqihar Univ., Qiqihar, China
fYear :
2011
fDate :
22-24 April 2011
Firstpage :
5678
Lastpage :
5680
Abstract :
Combined with high-rise frame-shearwall building of the International Education Center Project, Qiqihar University, it introduces winter construction process and winter maintenance, check calculating temperature of concrete according to Specification for Winter Construction of Building Engineering, which can be referred for construction of concrete in winter. The winter construction method of concrete structure is summarized in the severe cold region. The basic principles of comprehensive thermos method are described for the reinforced concrete structure in winter. The winter construction measures are defined further, such as reinforced works, the formwork works, in particular concrete works.
Keywords :
building standards; climatology; reinforced concrete; structural engineering; walls; Qiqihar University; cold areas; high rise frame shearwall building; reinforced concrete structures; specification for winter construction of building engineering; thermos method; winter construction process; winter maintenance; Architecture; Concrete; Educational institutions; Maintenance engineering; Presses; cold area; comprehensive thermos method; frame-shearwall structure; winter construction;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electric Technology and Civil Engineering (ICETCE), 2011 International Conference on
Conference_Location :
Lushan
Print_ISBN :
978-1-4577-0289-1
Type :
conf
DOI :
10.1109/ICETCE.2011.5776472
Filename :
5776472
Link To Document :
بازگشت