• DocumentCode
    3266608
  • Title

    1990s revolution in power systems manufacturing

  • Author

    Cassidy, Michael P. ; Sharma, Satya P.

  • Author_Institution
    AT&T, Mesquite, TX, USA
  • fYear
    1992
  • fDate
    23-27 Feb 1992
  • Firstpage
    160
  • Lastpage
    166
  • Abstract
    A revolution is underway in electronics manufacturing involving fundamental philosophy, structure, and process redesign. The authors describe how these changes have been carried out at AT&T Microelectronics´ Power Systems. Attention is given to the following aspects of this effort: quality, policy deployment, education and training, seven-step quality improvement, employee involvement, poka-yoke (in English, `mistake proofing´), and just-in-time. It is concluded that the changes have resulted in the best-ever quality, as evidenced by both internal quality assurance measurements and by direct feedback from customers. Intervals for both new product introduction and manufacturing have been dramatically reduced; 40% for new products and 50% for manufacturing. Shipping performance has improved 84%, with many focused factories routinely having 100% performance months
  • Keywords
    power supplies to apparatus; quality control; training; AT&T Microelectronics´ Power Systems; education; just-in-time; policy deployment; power systems manufacturing; product introduction; quality; shipping performance; training; Manufacturing; Power system management; Power system modeling; Power system planning; Power systems; Process planning; Production facilities; Quality management; Total quality management; Yarn;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Applied Power Electronics Conference and Exposition, 1992. APEC '92. Conference Proceedings 1992., Seventh Annual
  • Conference_Location
    Boston, MA
  • Print_ISBN
    0-7803-0485-3
  • Type

    conf

  • DOI
    10.1109/APEC.1992.228416
  • Filename
    228416