DocumentCode
3269357
Title
Perturbation Analysis to set the number of automated guided vehicles in a flexible manufacturing system
Author
Mebarki, Nasser ; Labadi, Karim
Author_Institution
Institut de Recherche en Communications et Cybernétique de Nantes, BP92101, 44321 Nantes Cedex 03 FRANCE. E-mail: mebarki@iut-nantes.univ-nantes
fYear
2003
fDate
12-12 June 2003
Firstpage
986
Lastpage
990
Abstract
By using perturbation analysis on a simulation model of a flexible manufacturing system, this paper proposes a procedure to size this system in order to maximize its productivity. This procedure is based on the identification of the function between flowtime (i.e., the flowtime for each product is computed as the delay between its completion time and its arrival time) and the decision variable, here the number of automated vehicles in the system. A formal evaluation of the performance gradient in each point of the simulation model is then possible.
fLanguage
English
Publisher
ieee
Conference_Titel
Control and Automation, 2003. ICCA '03. Proceedings. 4th International Conference on
Conference_Location
Montreal, Que., Canada
Print_ISBN
0-7803-7777-X
Type
conf
DOI
10.1109/ICCA.2003.1595170
Filename
1595170
Link To Document