Title :
Using Automated Event Handling for a Simulation-Based Process Coverage in Supply Networks
Author :
Dangelmaier, W. ; Döring, Andre ; Laroque, Christoph ; Timm, Thorsten
Abstract :
The project AC/DC, funded by the European Commission (contract number FP6-SST-031520), deals with new logistical concepts for planning and control of supply networks that enhance automotive manufacturing radically. To handle upcoming disturbances within the regarded supply network structure, a real-time event management system is developed in order to automatically handle occurring events in a highly reactive way based on reliable processes. The simulation-based approach of identification, classification and especially the automated evaluation of handling actions are introduced in this paper.
Keywords :
Automotive engineering; Computational modeling; Computer simulation; Costs; Demand forecasting; Discrete event simulation; Manufacturing; Process planning; Production systems; Supply chains; event handling; process coverage; simluation; supply network management;
Conference_Titel :
Computer Modeling and Simulation, 2008. UKSIM 2008. Tenth International Conference on
Conference_Location :
Cambridge, UK
Print_ISBN :
0-7695-3114-8
DOI :
10.1109/UKSIM.2008.57