DocumentCode
3273420
Title
The Fast Estimation Model of Project Cost Based on BP Neural Network
Author
Wang Zhihong ; Wang He ; Wang Yan
Author_Institution
Liaoning Tech. Univ., Huludao, China
fYear
2013
fDate
16-18 Jan. 2013
Firstpage
1449
Lastpage
1451
Abstract
Estimating project cost rapidly and accurately has important practical significance for cost control. According to the basic principles of the neural network and the analysis on the characteristics of the project, six project characteristic categories are identified as neural network input variables. On the basis of the theoretical analysis, the paper brings up the model of rapid estimation of project cost based on the BP Neural Network, and several finished residence projects are selected as actual samples. Test results show that the precision meets the estimation requirements well. Therefore, the application of BP Neural Network is effective in rapid estimation of project cost.
Keywords
backpropagation; costing; financial data processing; neural nets; project management; BP neural network; cost control; project cost estimation; Biological neural networks; Cost accounting; Educational institutions; Estimation; Feature extraction; Training; BP Neural Network; estimation model; project cost; rapid estimation;
fLanguage
English
Publisher
ieee
Conference_Titel
Intelligent System Design and Engineering Applications (ISDEA), 2013 Third International Conference on
Conference_Location
Hong Kong
Print_ISBN
978-1-4673-4893-5
Type
conf
DOI
10.1109/ISDEA.2012.346
Filename
6455552
Link To Document