DocumentCode
3275305
Title
Effects of Solubilization Treatment and Intermittent Operation on Clogging in Vertical Flow Constructed Wetland
Author
Guo-Fen Hua ; Wei Zhu ; Yun-Hui Zhang
Author_Institution
Coll. of Water Conservancy & Hydropower Eng., Hohai Univ., Nanjing, China
fYear
2013
fDate
16-18 Jan. 2013
Firstpage
696
Lastpage
699
Abstract
Effects of solubilization treatment and intermittent operation on clogging problem in lab-scale vertical constructed wetland were presented in this paper. The infiltrate rates were improved 3-5 times by solubilization treatment while 1-3 times by intermittent operation (resting), which indicated that both of the approaches could alleviate clogging problem to a certain degree. Furthermore, after solubilization treatment, the concentrations of elution increased rapidly and then decreased with operation time. And the recovered cycle of the treatment performance in wetland models was within 7-10 days after solubilization treatment, while after intermittent operation the recovery cycle was within 2-5 days. However, it should pay attention to the high concentration elution after solubilization treatment and the damage to plant after intermittent operation (resting 15 days).
Keywords
effluents; vegetation; wastewater treatment; clogging; elution concentration; infiltration rates; intermittent operation; laboratory scale vertical flow constructed wetland; solubilization treatment effects; Educational institutions; Integrated circuits; Soil measurements; Solids; Substrates; Temperature measurement; Wastewater; Clogging; Constructed wetland; Intermittent operation; Solubilization treatment;
fLanguage
English
Publisher
ieee
Conference_Titel
Intelligent System Design and Engineering Applications (ISDEA), 2013 Third International Conference on
Conference_Location
Hong Kong
Print_ISBN
978-1-4673-4893-5
Type
conf
DOI
10.1109/ISDEA.2012.165
Filename
6455933
Link To Document