Integrating realtime project progress input into a construction simulation model
Author
Xie, Hua ; AbouRizk, Simaan ; Fernando, Siri
Author_Institution
Dept. of Civil & Environ. Eng., Univ. of Alberta, Edmonton, AB, Canada
fYear
2011
fDate
11-14 Dec. 2011
Firstpage
3443
Lastpage
3454
Abstract
Computer simulation has been widely applied in modeling construction operation to gain insight into project performance. However, simulation models are rarely used after the project planning and design stage. One main constraint is the time and effort needed for collecting pertinent and correct information and processing it for input into the model. As projects progress and project circumstances change, simulation model inputs need to be updated to reflect these changes and maintain model validity. This paper demonstrates the integration of real time progress data into a simulation model, using a tunnel construction project as an example. A progress monitoring system was developed to capture progress data, and provide real time project progress input into a simulation model. The simulation model is able to revise the inputs in light of the actual progress and provide long-term support through project execution.
Keywords
digital simulation; public administration; real-time systems; computer simulation; construction operation; construction simulation model; integrating realtime project progress input; progress monitoring system; project performance; project planning; tunnel construction project; Databases; Load modeling; Personal digital assistants;
fLanguage
English
Publisher
ieee
Conference_Titel
Simulation Conference (WSC), Proceedings of the 2011 Winter
Conference_Location
Phoenix, AZ
ISSN
0891-7736
Print_ISBN
978-1-4577-2108-3
Electronic_ISBN
0891-7736
Type
conf
DOI
10.1109/WSC.2011.6148040
Filename
6148040
Link To Document