DocumentCode
3277343
Title
Model Differences between IEC 61970/61968 and IEC 61850
Author
Liu Ling ; Yu Hongyong ; Chen Xia
Author_Institution
Shandong Polytech., Jinan, China
fYear
2013
fDate
16-18 Jan. 2013
Firstpage
938
Lastpage
941
Abstract
IEC 61970 and IEC 61850 are the core standards of Smart Grid, and have been widely used in electric power automation. As these two standards defined data models and the interface respectively, the result is the models are not uniform and seamless communication cannot be operated between substation and the control center. This paper proposes two aspects differences, data model and service model. IEC 61970 defines the power of information model and broadly applied to enterprise integration. IEC 61850 is limited to exchange of data within substation equipments. IEC 61970 defines application program interface (API) and IEC 61850 defines abstract communication services interface (ACSI). To make the difference clear, it is benefit for harmonization the power data model.
Keywords
IEC standards; application program interfaces; control facilities; data models; electronic data interchange; smart power grids; substation automation; ACSI; API; IEC 61850; IEC 61968; IEC 61970; abstract communication services interface; application program interface; control center; data exchange; electric power automation; enterprise integration; information model; power data model harmonization; service model; smart grid; substation equipments; Computer integrated manufacturing; Data models; IEC standards; Substations; Unified modeling language; IEC 61850; IEC 61968; IEC 61970; Smart Grid;
fLanguage
English
Publisher
ieee
Conference_Titel
Intelligent System Design and Engineering Applications (ISDEA), 2013 Third International Conference on
Conference_Location
Hong Kong
Print_ISBN
978-1-4673-4893-5
Type
conf
DOI
10.1109/ISDEA.2012.224
Filename
6456213
Link To Document