Title :
Large Interconnections: Probelems and Actions for Adequacy Evaluation
Author :
Bertoldi, O. ; Nicola, G. ; Tagliabue, C. ; Salvaderi, L.
Author_Institution :
ENEL, SpA, Italy
Keywords :
Availability; Construction; Contracts; Delay; Load flow; Power transmission; Production; Reactive power; Skin; Voltage;
Conference_Titel :
Athens Power Tech, 1993. APT 93. Proceedings. Joint International Power Conference
DOI :
10.1109/APT.1993.673874