• DocumentCode
    3294218
  • Title

    Systemic Operation Tracking Production-progress and Control Delivery to Reach Customer Satisfaction

  • Author

    Hung, Jui-huang ; Tsai, Ming-hui ; Chien, Chia-hsiung

  • Author_Institution
    Powerchip Semicond. Corp., Hsinchu
  • fYear
    2006
  • fDate
    25-27 Sept. 2006
  • Firstpage
    276
  • Lastpage
    279
  • Abstract
    -This paper describes using POLS (production plan, output-line analysis and lot tracing system) for tracking production-progress and controlling delivery to reach customer satisfaction in PSC FAB8A. AT first we investigate problem issue and then introduce the structure and the algorithm of this system. In the end, it has been approved that this system improves delivery rate index (CLIP-confirm line index performance) by 35% and reduced time cost of the progress-control conspicuously.
  • Keywords
    customer satisfaction; production control; production planning; PSC FAB8A; confirm line index performance; control delivery; customer satisfaction; delivery rate index; production plan, output-line analysis and lot tracing system; systemic operation tracking production-progress; Control systems; Costs; Customer satisfaction; Delay; Dispatching; Electrical equipment industry; Foundries; Industrial control; Monitoring; Production systems;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Semiconductor Manufacturing, 2006. ISSM 2006. IEEE International Symposium on
  • Conference_Location
    Tokyo
  • ISSN
    1523-553X
  • Print_ISBN
    978-4-9904138-0-4
  • Type

    conf

  • DOI
    10.1109/ISSM.2006.4493082
  • Filename
    4493082