    Profit-based head-dependent short-term hydro scheduling considering risk constraints

  • Author

    Pousinho, H.M.I. ; Mendes, V.M.F. ; Catalao, Joao P. S.

  • Author_Institution
    Univ. of Beira Interior, Covilha, Portugal
  • fYear
    2011
  • fDate
    19-23 June 2011
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    This paper is on the short-term hydro scheduling (STHS) problem, particularly concerning a head-dependent cascaded hydro system. A mixed-integer quadratic programming approach is proposed for the STHS problem, considering not only head-dependency, but also discontinuous operating regions and discharge ramping constraints. Moreover, market uncertainty is introduced in the model via price scenarios, and risk-aversion is considered by limiting the volatility of the expected profit. Numerical results, based on one of the main Portuguese cascaded hydro systems, illustrate the proficiency of the proposed approach. Finally, conclusions are duly drawn.
  • Keywords
    hydroelectric power stations; integer programming; power generation economics; power generation scheduling; power markets; pricing; quadratic programming; risk management; Portuguese cascaded hydro systems; discharge ramping constraints; discontinuous operating regions; market uncertainty; mixed-integer quadratic programming approach; profit-based head-dependent short-term hydro scheduling problem; risk-aversion; Computational modeling; Discharges; Power generation; Reservoirs; Upper bound; Vectors; Hydroelectric power generation; market price; mixed-integer quadratic programming; power generation scheduling; risk and uncertainty;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    PowerTech, 2011 IEEE Trondheim
  • Conference_Location
    Trondheim
  • Print_ISBN
    978-1-4244-8419-5
  • Electronic_ISBN
    978-1-4244-8417-1
  • Type

    conf

  • DOI
    10.1109/PTC.2011.6019203
  • Filename
    6019203