DocumentCode
3298343
Title
Profit-based head-dependent short-term hydro scheduling considering risk constraints
Author
Pousinho, H.M.I. ; Mendes, V.M.F. ; Catalao, Joao P. S.
Author_Institution
Univ. of Beira Interior, Covilha, Portugal
fYear
2011
fDate
19-23 June 2011
Firstpage
1
Lastpage
6
Abstract
This paper is on the short-term hydro scheduling (STHS) problem, particularly concerning a head-dependent cascaded hydro system. A mixed-integer quadratic programming approach is proposed for the STHS problem, considering not only head-dependency, but also discontinuous operating regions and discharge ramping constraints. Moreover, market uncertainty is introduced in the model via price scenarios, and risk-aversion is considered by limiting the volatility of the expected profit. Numerical results, based on one of the main Portuguese cascaded hydro systems, illustrate the proficiency of the proposed approach. Finally, conclusions are duly drawn.
Keywords
hydroelectric power stations; integer programming; power generation economics; power generation scheduling; power markets; pricing; quadratic programming; risk management; Portuguese cascaded hydro systems; discharge ramping constraints; discontinuous operating regions; market uncertainty; mixed-integer quadratic programming approach; profit-based head-dependent short-term hydro scheduling problem; risk-aversion; Computational modeling; Discharges; Power generation; Reservoirs; Upper bound; Vectors; Hydroelectric power generation; market price; mixed-integer quadratic programming; power generation scheduling; risk and uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
PowerTech, 2011 IEEE Trondheim
Conference_Location
Trondheim
Print_ISBN
978-1-4244-8419-5
Electronic_ISBN
978-1-4244-8417-1
Type
conf
DOI
10.1109/PTC.2011.6019203
Filename
6019203
Link To Document