• DocumentCode
    3300608
  • Title

    Hub power project

  • Author

    Luxton, P.

  • Author_Institution
    Nat. Power, Leatherhead, UK
  • fYear
    35886
  • fDate
    30 Mar-1 Apr1998
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    The Hub project is located on the Arabian Sea coast of Pakistan in the province of Baluchistan and approximately 45 km from Karachi. The station has four 323 MW boiler turbine generator units of conventional design and burning heavy fuel oil. The design of the plant was conventional having a low level of technology risk. This project was arguably the largest privately financed power project in South East Asia. The fuel oil is supplied via an 80 km pipeline from the Pakistan State Oil Company terminal east of Karachi and the electricity generated is supplied into the 500 kV system owned and operated by the nationalised Water and Power Development Authority (WAPDA)
  • Keywords
    steam power stations; Arabian Sea coast; Baluchistan; Hub power project; Pakistan; Pakistan State Oil Company terminal; Water and Power Development Authority; boiler turbine generator units; heavy fuel oil; low technology risk; pipeline; privately financed power project;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Power Station Maintenance - Profitability Through Reliability, 1998. First IEE/IMechE International Conference on (Conf. Publ. No. 452)
  • Conference_Location
    Edinburgh
  • ISSN
    0537-9989
  • Print_ISBN
    0-85296-699-7
  • Type

    conf

  • DOI
    10.1049/cp:19980053
  • Filename
    674035