• DocumentCode
    3302581
  • Title

    A Workflow Model Supporting Dynamic BPR

  • Author

    Lei, Chen ; Bin, Liu

  • Author_Institution
    Sch. of Comput. Sci. & Eng., Wuhan Inst. of Technol., Wuhan
  • fYear
    2007
  • fDate
    16-18 Aug. 2007
  • Firstpage
    721
  • Lastpage
    724
  • Abstract
    Abstract BPR (Business Process Reengineering) theory puts its emphasis on "fundamental re-thinking and radically reengineering the enterprise business process", but neglects the continuous improvement, which make a lot of BPR projects result in failure. This paper analyzes the traditional BPR model, finds out factors that result in high failure rate of traditional BPR project and proposes the dynamical BPR model and a micro-kernel structure for the adaptive workflow management system model. The most important concept of dynamical BPR is changing the business process dynamically in the execution stage. It is implemented with the supporting of this workflow management system.
  • Keywords
    adaptive systems; business process re-engineering; workflow management software; adaptive workflow management system model; business process reengineering; dynamic BPR; high failure rate; micro-kernel structure; workflow model; Acceleration; Adaptive systems; Business process re-engineering; Computer science; Continuous improvement; Costs; Educational institutions; Failure analysis; Project management; Workflow management software;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Grid and Cooperative Computing, 2007. GCC 2007. Sixth International Conference on
  • Conference_Location
    Los Alamitos, CA
  • Print_ISBN
    0-7695-2871-6
  • Type

    conf

  • DOI
    10.1109/GCC.2007.33
  • Filename
    4293853