Assumption Analysis and Duration Simulation of Three-Point Estimate in PERT Technique
Author
Lei, Xiaoling
Author_Institution
Coll. of Manage. & Econ., Kunming Univ. of Sci. & Technol., Kunming, China
fYear
2011
fDate
19-21 May 2011
Firstpage
1
Lastpage
4
Abstract
The three-point estimate is an essential of PERT technique. Compared to CPM, it does not only require more level of effort, but also consider the time uncertainty of activities. This paper analyzes the assumptions of three-point estimate and proposes that the assumption conditions should be formulated according to the real project environment. Accordingly, this paper provides a simple hypothetical example which is solved using PERT technique. It expected duration is simulated and computed using the software package of Crystal BallTM. The result can facilitate the application of three-point estimate in PERT technique correctively and flexibly.
Keywords
PERT; project management; software packages; Crystal Ball software package; PERT technique; critical path method; duration simulation; program evaluation and review technique; real project environment; three-point estimate; time uncertainty; Analytical models; Computational modeling; Equations; Gaussian distribution; Planning; Project management; Uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
Computer and Management (CAMAN), 2011 International Conference on
Conference_Location
Wuhan
Print_ISBN
978-1-4244-9282-4
Type
conf
DOI
10.1109/CAMAN.2011.5778896
Filename
5778896
Link To Document