DocumentCode :
3304282
Title :
A major refurbishment project after 20 years operation at Hunterston B
Author :
Grant, J. ; Fischer, M.J. ; Petty, D.J. ; Eden, N.A. ; Elliott, J.
Author_Institution :
Siemens Power Generation, UK
fYear :
35886
fDate :
30 Mar-1 Apr1998
Firstpage :
196
Lastpage :
207
Abstract :
The upgrading of older steam turbine plant with modern technology has become an increasingly attractive way for utilities to increase efficiency and capacity. This paper describes one such upgrade, showing how advances in steam turbine technology have been successfully applied to both components and modules in a 660 MW steam turbine unit at Hunterston Power Station. The challenge of installing the modifications in a short outage time, and the solutions adopted to achieve it, are discussed
Keywords :
steam turbines; 660 MW; Hunterston B Power Station; capacity increase; efficiency increase; refurbishment project; short outage time; steam turbine plant upgrading;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Power Station Maintenance - Profitability Through Reliability, 1998. First IEE/IMechE International Conference on (Conf. Publ. No. 452)
Conference_Location :
Edinburgh
ISSN :
0537-9989
Print_ISBN :
0-85296-699-7
Type :
conf
DOI :
10.1049/cp:19980088
Filename :
674070
Link To Document :
بازگشت