    A major refurbishment project after 20 years operation at Hunterston B

  • Author

    Grant, J. ; Fischer, M.J. ; Petty, D.J. ; Eden, N.A. ; Elliott, J.

  • Author_Institution
    Siemens Power Generation, UK
  • fYear
    35886
  • fDate
    30 Mar-1 Apr1998
  • Firstpage
    196
  • Lastpage
    207
  • Abstract
    The upgrading of older steam turbine plant with modern technology has become an increasingly attractive way for utilities to increase efficiency and capacity. This paper describes one such upgrade, showing how advances in steam turbine technology have been successfully applied to both components and modules in a 660 MW steam turbine unit at Hunterston Power Station. The challenge of installing the modifications in a short outage time, and the solutions adopted to achieve it, are discussed
  • Keywords
    steam turbines; 660 MW; Hunterston B Power Station; capacity increase; efficiency increase; refurbishment project; short outage time; steam turbine plant upgrading;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Power Station Maintenance - Profitability Through Reliability, 1998. First IEE/IMechE International Conference on (Conf. Publ. No. 452)
  • Conference_Location
    Edinburgh
  • ISSN
    0537-9989
  • Print_ISBN
    0-85296-699-7
  • Type

    conf

  • DOI
    10.1049/cp:19980088
  • Filename
    674070