The upgrading of older steam turbine plant with modern technology has become an increasingly attractive way for utilities to increase efficiency and capacity. This paper describes one such upgrade, showing how advances in steam turbine technology have been successfully applied to both components and modules in a 660 MW steam turbine unit at Hunterston Power Station. The challenge of installing the modifications in a short outage time, and the solutions adopted to achieve it, are discussed
Keywords
steam turbines; 660 MW; Hunterston B Power Station; capacity increase; efficiency increase; refurbishment project; short outage time; steam turbine plant upgrading;
fLanguage
English
Publisher
iet
Conference_Titel
Power Station Maintenance - Profitability Through Reliability, 1998. First IEE/IMechE International Conference on (Conf. Publ. No. 452)
Conference_Location
Edinburgh
ISSN
0537-9989
Print_ISBN
0-85296-699-7
Type
conf
DOI
10.1049/cp:19980088
Filename
674070
Link To Document