DocumentCode :
3310758
Title :
A Long-Term Multi-objective Planning Tool for Distributed Energy Resources
Author :
Haesen, E. ; Driesen, J. ; Belmans, R.
Author_Institution :
ESAT-ELECTA, Heverlee
fYear :
2006
fDate :
Oct. 29 2006-Nov. 1 2006
Firstpage :
741
Lastpage :
747
Abstract :
Present changes in the operation of distribution grids call for a new way in which grid modifications are planned. This paper gives an overview of the changes on production and demand side as well as possible ways of planning the integration of distributed energy resources. Multiple objectives are often conflicting. An evolutionary algorithm is used to search for fit topologies of distributed resources and analyze the possible trade-offs
Keywords :
energy resources; evolutionary computation; power distribution planning; power grids; distributed energy resource; evolutionary algorithm; grid modifications; multiple objective planning tool; trade-offs; Cost function; Density estimation robust algorithm; Distributed power generation; Energy resources; Mesh generation; Optimization methods; Power generation; Power generation economics; Production; Voltage;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Systems Conference and Exposition, 2006. PSCE '06. 2006 IEEE PES
Conference_Location :
Atlanta, GA
Print_ISBN :
1-4244-0177-1
Electronic_ISBN :
1-4244-0178-X
Type :
conf
DOI :
10.1109/PSCE.2006.296409
Filename :
4075848
Link To Document :
بازگشت