DocumentCode :
3312520
Title :
An Approach to Determine Spinning Reserve Requirements in a Deregulated Electricity Market
Author :
Porkar, S. ; Fotuhi-Firuzabad, M. ; Farad, A.A.-T. ; Porkar, B.
Author_Institution :
Dept. of Electr. Eng., Sharif Univ. of Technol., Tehran
fYear :
2006
fDate :
Oct. 29 2006-Nov. 1 2006
Firstpage :
1341
Lastpage :
1344
Abstract :
To make the energy market reliable and transactions deliverable, transmission owners must provide required ancillary services that are critical to ensure transmission open access, and to maintain an acceptable level of power system security. Spinning reserve is one of the most important ancillary services required to maintain system reliability in case of occurring a contingency. By definition, spinning reserve is the unloaded section of synchronized generation that is able to respond immediately to serve load. Studies indicate that spinning reserve requirements have significant impacts on the energy market. A new spinning reserve market structure is proposed in this paper to best utilize the available resources to meet load and spinning reserve requirements with the transmission constraints while maintaining system security in the context of an energy market
Keywords :
power markets; power system reliability; power system security; deregulated electricity market; power system security; spinning reserve; system reliability; transmission constraints; Electricity supply industry; Electricity supply industry deregulation; Load forecasting; Maintenance; Power generation; Power system control; Power system reliability; Power systems; Senior members; Spinning;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Systems Conference and Exposition, 2006. PSCE '06. 2006 IEEE PES
Conference_Location :
Atlanta, GA
Print_ISBN :
1-4244-0177-1
Electronic_ISBN :
1-4244-0178-X
Type :
conf
DOI :
10.1109/PSCE.2006.296499
Filename :
4075938
Link To Document :
بازگشت