DocumentCode :
331561
Title :
State of the Art of Telecommunications Power in the UK
Author :
White, I.G.
Author_Institution :
British Post Office Telecommunications Headquarters
fYear :
1978
fDate :
25-27 Oct. 1978
Firstpage :
11
Lastpage :
17
Abstract :
Telecommunications equipment in the UK is supplied from a central, standard and modular power plant. Reliability and security is therefore regarded as of prime importance. The paper describes the current approach to modular plant both in the AC and IE fields. Flexibility in planning sad installation is achieved, capital costs are minimised and maintenance charges are reduced. The impact of electronic switching systems and the transition to digital techniques is reviewed, as is the need for energy conservation and future alternative power sources.
Keywords :
Communication switching; Maintenance; Power generation; Power system planning; Power system reliability; Telecommunication network reliability; Telecommunication standards; Telecommunication switching; Telecommunication traffic; Telephony;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Telephone Energy conference, 1978. INTELEC 78. International
Conference_Location :
Washington, DC
Type :
conf
DOI :
10.1109/INTLEC.1978.733944
Filename :
733944
Link To Document :
بازگشت