DocumentCode :
3319824
Title :
Non-chronological scheduling
Author :
Fox, Barry R.
Author_Institution :
McDonnell Douglas Space Syst. Co., Houston, TX, USA
fYear :
1990
fDate :
26-27 Mar 1990
Firstpage :
72
Lastpage :
77
Abstract :
A nonchronological scheduling approach used to develop powerful, generic scheduling capabilities that can be used in the implementation of a broad spectrum of space shuttle and space station scheduling applications is discussed. It is shown that reliance on chronological (simulation-based) scheduling methods may fail to satisfy important requirements or may result in exceptionally complex software. Nonchronological scheduling methods satisfy major requirements and provide a unified approach to the resolution of constraints and requirements
Keywords :
aerospace computing; scheduling; space vehicles; generic scheduling capabilities; nonchronological scheduling approach; space shuttle; space station scheduling applications; Job shop scheduling; Manufacturing; NASA; Power engineering and energy; Processor scheduling; Sociotechnical systems; Space shuttles; Space stations; Space technology; Systems engineering and theory;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
AI, Simulation and Planning in High Autonomy Systems, 1990., Proceedings.
Conference_Location :
Tucson, AZ
Print_ISBN :
0-8186-2043-9
Type :
conf
DOI :
10.1109/AIHAS.1990.93922
Filename :
93922
Link To Document :
بازگشت