• DocumentCode
    3324953
  • Title

    EIPP Data Management Task Team Architecture

  • Author

    Myrda, Paul ; Gehrs, Mel ; Gunther, Erich ; Melcher, Jerry

  • fYear
    2007
  • fDate
    Jan. 2007
  • Firstpage
    118
  • Lastpage
    118
  • Abstract
    The Eastern Interconnection Phasor Project (EIPP) is advancing the state of the art in power system monitoring and shares information deemed to be valuable in enhancing the reliability of the bulk power grid. Within the project various teams have been assembled to address activities essential to the successful deployment of the project. One of the teams is the data management task team. This paper will describe both the current and future states of data management and especially how the future state will support the long term vision of the EIPP that calls for delivering value within the operations environment using new inter-regional information and measurement systems
  • Keywords
    database management systems; power grids; power system analysis computing; power system measurement; power system reliability; EIPP data management; Eastern Interconnection Phasor Project; measurement systems; power grid reliability; power system monitoring; task team architecture; Energy management; Fault tolerant systems; Monitoring; Power system interconnection; Power system management; Power system reliability; Project management; Protocols; Testing; US Department of Energy;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    System Sciences, 2007. HICSS 2007. 40th Annual Hawaii International Conference on
  • Conference_Location
    Waikoloa, HI
  • ISSN
    1530-1605
  • Electronic_ISBN
    1530-1605
  • Type

    conf

  • DOI
    10.1109/HICSS.2007.197
  • Filename
    4076608